The proposed rule would have implemented Executive Order 13690 on establishing a Federal Flood Risk Management Standard by introducing standards for construction in floodplains aimed at mitigating future flood risk in the context of a changing climate. For example, the proposed rule would have required new construction projects situated in flood-prone areas to be elevated or flood-proofed between 2 and 3 feet above the 100-year floodplain.